The power distribution infrastructure at Monash Medical Centre in Melbourne was end of life and needed to be replaced. NHP met with the hospital to understand their requirements and recommended a SMART closed transition switch solution made possible by the Terasaki ACB, which guarantees a seamless transition from mains power to generator. This has reduced the need for months of planning for when the hospital undertakes mandatory quarterly testing of its generators, all the while keeping patient safety at the forefront.
Watch the video to learn more.
For more information on NHP’s SMART Distribution solutions, please call your local NHP Account Representative or email us:
Australia - 1300 NHP NHP nhpsales@nhp.com.au
New Zealand - 0800 NHP NHP sales@nhp-nz.com